Pre-lock up Construction


Electric and plumbing rough out, bricks begin! 9th September
Facade - very happy with brick colour :)

 Garage

 
 Side of house

Front door 

 Kitchen

 Master shower

Plaster waiting

 Laundry side

Bathroom Shower

Bathroom Tub 



Roof on! 1st September
Laundry Side 

Facade

Alfresco

Master Windows

Master bath

Dining / Lounge

Garage


Bricks - Austral Blackwood

Fascia/Gutters

Front door




Frame up! 26th August
Alfresco area

 WC

Side of house

Theatre room

Pantry

Theatre windows

Bed 1

Kitchen

Bed 2

Laundry

Laundry side of house

Garage door

Front door

Dining & Lounge

Bathroom

Master Bed

Garage

Slab down! 16th August
Blair went to the block today 16/8 and saw the slab is down.. whooppee! Form work is off so he reckons it went down yesterday? Any predictions on a frame? 


 The bad news? Our pool  is gone.. Good news? We have a floor for our garage!
 Portico in middle, Master bedroom on left with ensuite and WIR behind
  Behind garage is bed 3, then WC, bath, Bed 2 and at the end is family room. Alfresco to the left of family room
  Love you sun.. Keep up the good work!
                           Close up of Master ensuite and Laundry sink pipe on left
 Our little block.. Blair was worried we were very close to the boundary.. now slab is down he has calmed a bit thank goodness..


Yay! Things are happening!
12th August

Now that we are all titled and settled... things are happening at our block! We titled on the 12th July with settlement on the 26th July.

We went to visit the block on the 12th August to see the sitescrape had been done! It's just so exciting to see the progress!

Corner Villella Dve and Hamish Ave
 


 From our driveway


 Our pool/garage

Power

360 Degree spin of Worthington